wap_logo
home - News - Analysis of finished product protection, adjustment and fastening of space frame
2022.02.12

Analysis of finished product protection, adjustment and fastening of space frame

Analysis of finished product protection, adjustment and fastening of space frame

Protection of finished products after space frame processing

  1. After the steel space frame is installed, you should pay attention to synchronization when disassembling the rack, and remove it gradually to prevent stress concentration, causing local deformation of the space or local space frame.
  2. After the installation of the steel space frame, the anti-rust paint should be applied in time. After the bolt ball spaceframe is installed, check whether the holes on the bolt balls are closed. Use putty to fill in the gap between the holes and the sleeve and paint to prevent moisture from penetrating and corroding the threads of the balls and rods. 
  3. After the steel space frame is installed, the finished space frame should be protected, and objects should not be stacked on top of the space frame. If there are roof panels and purlins that need to be installed, they should also be scattered and stacked without overloading.
  4. After the steel space frame is installed, if the purlin or roof panel needs to be hoisted by a crane, it should be handled with care, and it is strictly forbidden to hit the space frame to deform the it.