According to the characteristics of the project, this project adopts rectangular square pyramid space frame structure with bolt-ball joint.
This steel structure project is an airport reconstruction and expansion project. The new passenger terminal building is located on the north side of the existing terminal building.
This steel structure project is an airport reconstruction and expansion project. The new passenger terminal building is located on the north side of the existing terminal building.
The total length of the football stadium is about 249.5m and the total width is about 246.3m. It is divided into four parts by setting seams, with a total area of about 21439m.
The total length of the football stadium is about 249.5m and the total width is about 246.3m. It is divided into four parts by setting seams, with a total area of about 21439m.
The total construction area of the steel hall is about 40,000 square meters. The plane size is 336m×80m, and the highest height is 28.8m. The steel exhibition hall is a medium-sized exhibition building, and the exhibition hall is divided into grades B according to the exhibition area.
The total construction area of the steel hall is about 40,000 square meters. The plane size is 336m×80m, and the highest height is 28.8m. The steel exhibition hall is a medium-sized exhibition building, and the exhibition hall is divided into grades B according to the exhibition area.
Sanya Commercial Shopping Center roof space frame is assembled and closed. The space frame roof structure is nearly 8,300 tons, and the total steel volume is nearly 38,000 tons, which is comparable to the steel consumption of the National Gymnasium's "Bird's Nest".
Sanya Commercial Shopping Center roof space frame is assembled and closed. The space frame roof structure is nearly 8,300 tons, and the total steel volume is nearly 38,000 tons, which is comparable to the steel consumption of the National Gymnasium's "Bird's Nest".
Jinan Licheng Space Frame Sports Center Gymnasium has a building area of 15,515 square meters, an auxiliary training venue of 19,963 square meters.
Jinan Licheng Space Frame Sports Center Gymnasium has a building area of 15,515 square meters, an auxiliary training venue of 19,963 square meters.