According to the characteristics of the project, this project adopts rectangular square pyramid space frame structure with bolt-ball joint.
The project is divided into three phases with a total construction land area of 81,384.1 square meters.
The project is divided into three phases with a total construction land area of 81,384.1 square meters.
The roof space frame structure of the airport terminal metallic building project adopts a hyperboloid steel space frame structure, with a length of 299m in the east-west direction and 76m in the north-south direction.
The roof space frame structure of the airport terminal metallic building project adopts a hyperboloid steel space frame structure, with a length of 299m in the east-west direction and 76m in the north-south direction.
The area of the metallic building roof steel structure of the corridor is about 14,000 square meters, the weight is about 1200t, and the lifting height is 10m.
The area of the metallic building roof steel structure of the corridor is about 14,000 square meters, the weight is about 1200t, and the lifting height is 10m.
This project is a aircraft hangar project ,witch adopts welded ball space frame structure, with a length of about 120 meters and a span of 78 meters.
This project is a aircraft hangar project ,witch adopts welded ball space frame structure, with a length of about 120 meters and a span of 78 meters.
The T2 terminal building consists of the main building, the two wings of the main building, the airside concourse and the satellite hall.
The T2 terminal building consists of the main building, the two wings of the main building, the airside concourse and the satellite hall.
The hangar has high fireproof performance to avoid the fire. The main frame of the hangar can adopt the space frame structure.
The hangar has high fireproof performance to avoid the fire. The main frame of the hangar can adopt the space frame structure.