marketing@lfspaceframe.com
+86-516-8595-0258
+86 177 5193 6871
222, Block B, Diamond International, Guozhuang Road, Xuzhou, Jiangsu, China
The stand of Hohai University Stadium is a three-story frame structure with a construction area of about 5,000 square meters.
The final assembly workshop of the space frame project is 421.6m long and 189.4m wide.
The steel structure roof of the No. 18 hangar of the Guangzhou Southern Airlines GAME CO Maintenance Facility Phase III has been steadily lifted in place, marking the official topping of the steel structure of the hangar with the largest projected area in South China and the third-largest in Asia.
To enable the combined space frame structure to work together, the key lies in the connection structure of the winding nodes.
The construction of the space frame installation structure is just like mushrooms after the rain, serving people with extremely powerful strength and momentum, which is inseparable from the technical and superiority of the space frame engineering, but during the period, we must be cautious about possible failures. problem.
Products
Application
Message
Contact